TI budget & allowance gap calculator
Hard construction, infrastructure add-ons, design and permit fees, the ADA path-of-travel reserve and contingency — measured against the landlord’s TI allowance on the basis your lease actually uses.
| Line item | Low | Mid | High |
|---|
Sources: JLL 2026 U.S. & Canada Office Fit-Out Cost Guide; Meade Design 2025–2026 U.S. fit-out benchmarks; ANSI/BOMA Z65.1; 28 CFR § 36.403(f). Preliminary rough-order-of-magnitude estimate for lease negotiation — confirm with a test fit and GC pricing.
How the numbers are built
RSF and USF
Construction is priced on usable area. RSF = USF × (1 + load factor), per ANSI/BOMA Z65.1. Enter the area the way your LOI states it and the calculator converts the other.
Sector × tier × shell × market
Full fit-out benchmarks by sector and finish tier (office tiers from JLL 2026). A cold dark shell adds HVAC distribution, power and restrooms; a warm shell credits existing systems; second-generation space applies reuse factors.
Fees, permits, ADA, contingency
Architectural & MEP design at 8–15% of construction (split across the AIA phases), a $0.12–$0.25/SF test fit, $1.50–$5.00/SF permit fees by market, the 20% ADA path-of-travel cap and a 12% contingency.
Why RSF vs. USF matters
On an 8,000 USF suite with a 15% load factor (9,200 RSF), a $50/SF allowance is worth $460,000 on RSF but only $400,000 on USF — a $60,000 swing in landlord capital decided by one word in the work letter. Read more in shell conditions compared and the 2026 benchmarks.
This is a preliminary rough-order-of-magnitude estimate for lease negotiation, not a contractor bid. Validate it with a pre-lease test fit and GC pricing before lease execution. Screening a change of use? Use the change-of-occupancy & ADA checker.