Change-of-occupancy & ADA trigger checker

Compare the suite’s approved use with what you plan to open, and see the IBC, plumbing, kitchen-exhaust and ADA consequences before the lease is executed.

Occupancy
Suite
Suite floor level
Existing base-building automatic sprinklers
Accessibility
Pre-Lease Code & ADA Screening MemoPreliminary screening — confirm with the authority having jurisdiction
SHEETCO-1
Occupancy—
Occupant load—
ADA 20% cap—
Overall permitting risk tier —

What the checker tests

CheckRule appliedReference
Occupant loadB office 150 SF gross · B outpatient 100 SF gross · M 30 SF gross · A-2 tables and chairs 15 SF net · A-2 standing 5 SF netIBC Table 1004.5
ExitsTwo exits at 50 or more occupants; panic hardware on assembly egress doors at 50+IBC Table 1006.2.1 IBC § 1010.2.9
A-2 sprinklersFire area over 5,000 SF, 100+ occupants, or not on the level of exit dischargeIBC § 903.2.1.2
Kitchen exhaustGrease-producing appliances need a Type I hood, grease duct and wet-chemical suppressionIBC § 904 NFPA 96
Plumbing fixturesRestaurants 1 WC per 75 per sex; bars 1 per 40; business 1 per 25 then 1 per 50; mercantile 1 per 500IBC Table 2902.1
ADA path of travelUp to 20% of the primary-function alteration cost, spent in statutory priority order28 CFR § 36.403(f)–(g)

Screening only: jurisdictions adopt different IBC editions with local amendments, and the building official has the final word. For a sealed code analysis, see code & change-of-occupancy reviews, or price the build-out in the TI budget calculator.