2026 U.S. commercial fit-out cost & architectural fee benchmarks
The reference tables behind our test fits and budgets: office fit-out tiers, sector build-out and soft costs, shell delivery conditions with typical TI allowances, and the infrastructure items that break budgets.
Table 1 — U.S. office fit-out cost by workplace type and specification ($/SF)
| Workplace type | Baseline | Medium | High | Market range |
|---|---|---|---|---|
| Open & agile (progressive) | $255 | $275 | $310 | $170 – $380 |
| High spatial variety (mixed open & private) | $275 | $295 | $340 | $180 – $405 |
| Structured / traditional (mostly enclosed) | $285 | $310 | $355 | $190 – $425 |
Source: JLL 2026 U.S. & Canada Office Fit-Out Cost Guide. National medium-quality average ≈ $295/SF. Mechanical & electrical = 29–37% of cost; builders’ works ≈ 29%; furniture, AV, technology & security ≈ 10–12%.
Table 2 — Multi-sector commercial TI build-out and soft-cost schedule
| Sector | Hard cost ($/SF) | A&E fee (% of hard cost) | A&E fee ($/SF) | Municipal permit ($/SF) |
|---|---|---|---|---|
| Office / workplace | $170 – $425 (≈ $295 medium) | 8% – 11% | $8 – $12 | $1.50 – $5.00 |
| Retail / showroom | $100 – $225 (refresh $50 – $100) | 8% – 10% | $8 – $12 | $1.50 – $5.00 |
| Medical / dental clinic | $150 – $350+ (specialty $500 – $750) | 11% – 15% | $18 – $30+ | $1.50 – $5.00 |
| Restaurant / food service | $175 – $700+ (casual $200 – $450) | 11% – 15% | $18 – $30+ | $1.50 – $5.00 |
Source: JLL 2026 U.S. & Canada Office Fit-Out Cost Guide (office); Meade Design compilation of 2025–2026 U.S. contractor, CRE broker and fit-out cost reports (retail, medical, restaurant). Permit fees derive from ICC Building Valuation Data or contractor valuation and run highest in Tier-1 metros.
Table 3 — Shell delivery condition: tenant construction cost and typical landlord TI allowance
| Delivery condition | Tenant construction ($/SF) | Typical TI allowance ($/SF) | Key architectural / MEP risk |
|---|---|---|---|
| Cold dark shell (gray shell) | $60 – $150+ standard · $200 – $350+ medical / restaurant | $30 – $60+ | No interior HVAC or ducting ($15 – $30/SF), no electrical distribution ($10 – $20/SF), no restrooms, slab trenching for plumbing |
| Warm vanilla shell (white box) | $35 – $90 | $10 – $30 | Base HVAC, lighting grid, perimeter drywall and a base restroom exist; custom partitions and MEP changes still add up |
| Second-generation — cosmetic | $5 – $10 | $10 – $25 | Fastest opening and lowest capital, if the existing layout genuinely fits |
| Second-generation — reconfiguration | $25 – $70 | $10 – $25 | Layout mismatches require demolition and trigger ADA and code audits |
Source: Meade Design compilation of 2025–2026 U.S. contractor, CRE broker and fit-out cost reports. Construction-only ranges for light-to-standard finish programs; exclude furniture, technology and specialty MEP.
Table 4 — Major MEP, code and design line items
| Line item | Installed cost | Governing reference |
|---|---|---|
| Type I kitchen exhaust hood + make-up air | $20,000 – $55,000+ (≈ $4,000 – $5,000 per linear foot) | NFPA 96 · IMC § 507 |
| Wet-chemical fire suppression | $3,000 – $8,000 | IBC § 904 |
| Grease interceptor — indoor hydromechanical | $1,000 – $3,500 | IPC § 1003 |
| Grease interceptor — automatic removal unit (AGRU) | $4,000 – $8,000+ | IPC § 1003 |
| Grease interceptor — in-ground gravity vault | $5,000 – $15,000+ | IPC § 1003 |
| ADA restroom — single, build or remodel | $15,000 – $45,000+ | 2010 ADA Standards § 213, § 603 |
| ADA restroom core — new dual / multi-stall with trenching | $30,000 – $90,000+ | 2010 ADA Standards § 213 |
| Pre-lease test fit | $0.12 – $0.25/SF or $1,500 – $5,000 flat · 5 – 10 business days | LOI test-fit allowance |
| Construction contingency | 10% – 15% of hard cost | Owner budget practice |
Source: Meade Design compilation of 2025–2026 U.S. contractor, CRE broker and fit-out cost reports.
Reading the tables
What these numbers include — and what they don’t
- Tables 1 and 2 are full fit-out costs from a shell-and-core starting point, including furniture, AV, technology and security allowances. They are what a tenant’s total build-out costs per square foot.
- Table 3 is tenant construction only for light-to-standard finish programs, by delivery condition. Use it to compare suites; use Tables 1–2 to budget a full move-in.
- Regional spread is large. Tier-1 metros (New York, San Francisco, Boston, Los Angeles) typically run about 25% above growth markets such as Dallas, Austin, Denver and Atlanta; Midwest and Southeast regional markets run about 12% below.
- Soft costs come on top. Design fees (8%–15%), permits ($1.50–$5.00/SF), test fits ($0.12–$0.25/SF) and a 10%–15% contingency are not inside the hard-cost ranges.
- Allowances are quoted on RSF in most office leases; construction happens in USF. Convert before comparing — see the shell-conditions comparison.
Primary sources: JLL, 2026 U.S. & Canada Office Fit-Out Cost Guide; International Code Council, IBC and IEBC; U.S. Department of Justice, 2010 ADA Standards and 28 CFR § 36.403; NFPA 96; ANSI/BOMA Z65.1. Non-office ranges are a Meade Design compilation of 2025–2026 U.S. contractor, broker and fit-out cost reports. Licensed CC BY 4.0 — cite “Meade Design, 2026 U.S. Commercial Fit-Out Benchmarks”. Methodology on the studio page.