Services

Pre-lease test fits & space planning

A dimensioned layout of your program on the actual suite — before the LOI is final, while the allowance, the delivery condition and the free rent are still negotiable.

Printed office floor plan with a pen, glasses and a tape measure

What a test fit delivers

A test fit answers one question with drawings instead of a broker’s estimate: does this suite work for this business, and what will it take to build? We lay your program onto the landlord’s CAD backgrounds or a measured field survey and return:

  • TF-1
    Demising & area check

    Suite boundaries, column grid and window line, with usable area reconciled against the RSF quoted in the LOI.

  • TF-2
    Program layout

    Private offices, workstations, exam rooms, seats or sales floor — with headcount or seat count stated on the sheet.

  • TF-3
    Circulation & egress

    Corridors, exits, common path and travel distance for the occupant load you are planning.

  • TF-4
    ADA clearances

    Restroom, door and route clearances under the 2010 ADA Standards — the items plan check will mark up first.

  • TF-5
    Core & MEP constraints

    Plumbing stack and slab-trenching distances, rooftop or shaft access for exhaust, electrical service capacity and HVAC zoning notes.

Pricing & turnaround

ItemBenchmark
Test fit fee, per square foot$0.12 – $0.25 / SF
Test fit fee, flat lump sum$1,500 – $5,000
Turnaround5 – 10 business days
Revision round includedOne

Source: Meade Design 2025–2026 U.S. fit-out benchmarks. Medical, dental and restaurant fits sit at the top of the range because of plumbing and exhaust planning.

Negotiate a separate test fit allowance in the LOI

Landlords who want the deal routinely pay for the test fit — but only if you ask before the LOI is signed. Ask for a test fit allowance as its own line, not a draw against the TI allowance:

  1. Name it separately. “Landlord shall reimburse Tenant up to $0.15/RSF for a space plan / test fit, in addition to the Tenant Improvement Allowance.”
  2. Make it reimbursable on any suite. If you are comparing two or three buildings, each landlord should fund its own fit — that is the broker’s leverage.
  3. Keep the TI dollars intact. Every design dollar paid out of the TI allowance is a dollar not spent on construction.
  4. Tie the delivery condition to the fit. Once the layout shows what the suite needs, list base-building work (HVAC distribution, restroom upgrades, ADA entrance) as landlord work in the LOI.

From approved test fit to ROM pricing

An approved test fit becomes the basis for a general contractor’s rough order of magnitude (ROM) price. We add a short outline specification — finish tier, ceiling and lighting type, HVAC approach, plumbing fixture count — so two or three GCs price the same scope. The ROM then goes into the lease negotiation: if it exceeds the allowance, you are negotiating with numbers, not adjectives.

Price the gap between the ROM and the allowance before the GC does.

Open the TI budget calculator

Have a suite under LOI?

Send the floor plan and the work letter. We will tell you what fits, what it costs and what the allowance leaves uncovered.

Request a Test Fit